Mobilisation Checklist Item

ID Mobilisation Responsible Organisation Requirement Code Description Required
1 MOB-0117-01 Torrens Mechanical MC-01 Insurance currency verified for Torrens and Apex.
2 MOB-0117-01 Kestrel Ridge Mine MC-02 All personnel inducted and access authorised.
3 MOB-0117-01 Torrens Mechanical MC-03 Competency evidence verified for supervisors and r...
4 MOB-0117-01 Kestrel Ridge Mine MC-04 Contractor plant inspected and approved for site.
5 MOB-0117-01 Torrens Mechanical MC-05 Site interface plan submitted and accepted.
6 MOB-0117-01 Kestrel Ridge Mine MC-06 Joint SIMOPS coordination meeting held with Delta ...
7 MOB-0117-01 Kestrel Ridge Mine MC-07 Emergency response and muster arrangements briefed...