- Documentation
- /
- Csim
- /
Quick Reference
Menu map, demo-data codes and statuses
Menu Map
| Group | Models |
|---|---|
| Interfaces & Controls | Interface Register, Interface Hazard, Interface Control, Interface Decision, Coordination Meeting, Meeting Attendance |
| Contracts & Work | Contract, Contract Requirement, Work Package, Subcontractor Engagement, Mobilisation, Mobilisation Checklist Item, Demobilisation |
| Assurance & Improvement | Field Assurance Event, Assurance Finding, Stop Work Event, Incident, Corrective Action |
| Contractors | Contractor Profile, Contractor Document, Contractor Performance Review |
| People & Access | Person, Person Competency, Site Induction, Site Access Authorisation, Role Requirement |
| Plant & Equipment | Contractor Plant, Plant Site Approval |
| Reference & Administration | Organisation, Site, Site Area |
The Demo Scenario
Kestrel Ridge Mine (KRM) runs a planned crusher shutdown in August 2026. Two contractors work the same corridor at once — which is the entire point.
| Code | What it is |
|---|---|
TORR / KRM-C-2026-014 |
Torrens Mechanical — maintenance contract, risk tier HIGH |
DELTA / KRM-C-2026-021 |
Delta Electrical — separate contract, same window |
APEX |
Apex Rigging — subcontractor, CONDITIONAL_APPROVAL, may only work under Torrens supervision |
WP-2026-0117 |
CR-200 primary crusher liner change — ACTIVE, HIGH risk, SIMOPS |
WP-2026-0121 |
Substation 3 cable termination — the overlapping package |
IF-0117-02 |
The lifting interface — crane loads pass over the walkway to Substation 3. Risk EXTREME |
CTL-01 |
The critical control: hard barricade + spotter whenever a load is suspended |
FA-2026-0442 |
Control verification that found CTL-01 not in place with a load suspended |
INC-2026-0233 |
Near miss — packer fell ~4 m into the area that should have been barricaded. Actual LOW, potential CRITICAL |
DEC-0117-01 → -02 |
Lifting decision superseded after the stop-work: walkway now closed entirely |
TM-TR-04 |
Service truck rejected at plant inspection — illegible load chart. Never mobilised |
PR-2026-Q3-TORR |
Quarterly review — safety NEEDS_IMPROVEMENT, schedule EXCELLENT |
The thread worth following: IF-0117-02 → HZ-02 → CTL-01 →
FA-2026-0442 → CRITICAL finding → stop-work → DEC-0117-02 →
CA-2026-0501/0502. That is the core chain end to end, with a real failure in
the middle.
Status Vocabularies (the important ones)
Work package: PLANNED → RISK_REVIEW → MOBILISATION → READY_TO_START →
ACTIVE → PAUSED / SUSPENDED → COMPLETED → HANDOVER → CLOSED, plus CANCELLED
Contractor: PROSPECTIVE → PREQUALIFICATION → CONDITIONAL_APPROVAL →
APPROVED → ACTIVE → SUSPENDED / EXPIRED / DISQUALIFIED / INACTIVE
Control: PROPOSED → ACCEPTED → IMPLEMENTED → VERIFIED, plus
INEFFECTIVE, SUSPENDED, RETIRED — INEFFECTIVE is a first-class state,
not a deletion
Finding: OPEN → ASSESSED → ACTIONED → AWAITING_VERIFICATION → VERIFIED →
CLOSED, plus REJECTED, VOID
Finding type includes POSITIVE_OBSERVATION — the register is not only a fault log
Action: OPEN → ACCEPTED → PLANNED → IN_PROGRESS → BLOCKED → COMPLETED →
VERIFIED → CLOSED, plus CANCELLED, OVERDUE
Competency: REQUIRED · SUBMITTED · VERIFIED · CURRENT · EXPIRING ·
EXPIRED · REJECTED · NOT_APPLICABLE
Access: REQUESTED · UNDER_REVIEW · APPROVED · ACTIVE · SUSPENDED ·
EXPIRED · REVOKED · DEMOBILISED
Plant: PROPOSED · DOCUMENT_REVIEW · INSPECTION_REQUIRED · APPROVED ·
ACTIVE · RESTRICTED · QUARANTINED · REMOVED · REJECTED
Inspection outcome: PASS · PASS_WITH_ACTION · FAIL · STOP_WORK ·
NOT_APPLICABLE
Escalation: CONTRACTOR_SUPERVISOR → SITE_REP → CONTRACT_OWNER →
SITE_MANAGER → SSE → EXECUTIVE → REGULATOR
Rules of Thumb
- An interface names both sides:
work_package_idandother_work_package_id. If only one is populated, the interaction is with an area or a standing hazard rather than another package. - A control without a
next_verification_due_atis a control nobody is checking. Sort by that column to find them. - Competency, induction and access expire independently. All three must hold for someone to be genuinely mobilised — the demo has a supervisor whose competency expired, so access was suspended while the induction stayed valid.
- Plant approval is per site, per period, per area.
RESTRICTEDandREJECTEDplant may still exist in the register — that is the point of keeping the contractor's asset separate from this site's decision about it. - A stop-work must state
conditions_for_restart. Restart is an approval by a named person, not a lapse of time. - Corrective actions from a performance review are the mechanism for systemic issues; actions from findings and incidents are the mechanism for specific ones. Both land in the same list.