Contractor & Site Interface Documentation

Contractor governance and the operational interface between parties sharing a work area

This section covers the Contractor and Site-Interface Management application specifically. For how the interface works in general (lists, forms, navigation, deletion), see the Framework Guides above.

In This Section

The Application in One Paragraph

CSIM governs what happens when more than one organisation works the same ground. A contractor is prequalified into a ContractorProfile, engaged through a Contract, and does bounded work under a WorkPackage with a place, a period, a site representative and a contractor supervisor. Subcontractors are disclosed rather than hidden. Where two packages overlap — in area, in time, in energy, or in a load path — an InterfaceRegister entry records the interaction, its InterfaceHazards and the InterfaceControls that manage them, each with an owner, a performance requirement and a verification frequency. People are mobilised only once competency, induction and access line up; contractor plant is separately approved for the site. FieldAssuranceEvents then test in the field whether those controls actually hold, producing AssuranceFindings that may escalate to a StopWorkEvent, sit alongside an Incident, and resolve through CorrectiveActions — which also flow from a periodic ContractorPerformanceReview. The package ends with a Demobilisation handover.

Design boundary. This app supports contractor-interface governance and evidence. It does not replace procurement/ERP, HR/payroll, physical access control, statutory appointments, permit systems, the CMMS or the mine safety management system — those stay authoritative, and the *_reference fields throughout carry their handles.